The installation process for solar panels is easier than you might think. Now is the perfect time to make the switch.
Want to learn how solar panels are installed? Perhaps you’re trying to convince a friend to switch over to solar, or maybe you’re just curious.
Still not convinced? We’ve created this article to explain everything you need to know about solar panel installation. Our expert tips will answer your questions and help you make an informed decision on when to switch and how to get started.
Keep reading to learn more.
Site Assessment and Design
When installing a solar panel system, the first step is to conduct a site assessment and design stage. To decide the ideal size and positioning of the system and its components, an investigation of the potential solar site is necessary.
The assessment considers factors such as the direction the panels will face, the areas of the roof with the most access to direct sunlight, and the environmental factors such as shadowing and wind that may affect the installation. Utility and building inspections are made for compatibility and adherence to regional regulations.
Once the information has been collected and reviewed, the most efficient and cost-effective system design is determined. The design stage helps to select the right products and decide the best installation practices.
Prepare the Site With Mounting Brackets and Guide Wires
Solar panel installation begins with preparing the site by mounting brackets and guide wires. Installers mount brackets to the roof or any other surface where the solar panels will be placed.
The brackets are placed in place and the installers use guide wires, which are thin steel wires, for they are in the right position and ready to accept the solar panels. They use a special drilling method to secure anchoring screws to the mounting brackets, strengthening them in place.
Once the panel location and orientation are confirmed, the installers can more easily install the solar panels in the desired direction, thus ensuring the greatest power absorption. The guide wires act as a guide for the installed panels for proper alignment.
Permitting
Solar panel installation permitting is a critical step for homeowners who wish to install solar panels on their property. As each location has unique zoning laws and regulations, this is an important process that cannot be overlooked. This process ensures that the installation of solar panels follows all safety standards and local regulations.
The first step is to get a lot that is approved by the local government agency in charge of regulating the solar panel installation. This let is reviewed by the local zoning board to check that all requirements are met, including land-use restrictions, the panel’s type, materials, and size.
Installation of Solar Panel
Solar panel installation services are fairly simple and straightforward, but there are a few steps that must be taken for a successful installation. First, the site must be evaluated to decide what type and size of a solar photovoltaic system is optimal for the intended location.
Second, an inverter or Power Optimizers must choose and installed, if necessary. Third, the solar panels will be positioned to maximize their efficiency and meet local codes.
After the panels are in place, a licensed electrician will install grounding screws and conduit, as well as bonding the metal components. Once all the components are ready and in place, the panels can be connected in series and installed on the roof.
Government Inspection
During a solar panel installation, the government will inspect whether the work is being done properly and efficiently. They will look for any potential hazards such as wiring concerns, roof integrity, and air quality.
Government inspectors may conduct an onsite visit to see the installation process, look at the equipment being used, see safety protocols, and review the completed work. They may also take some basic measurements for the solar panel system to be correctly calibrated to maximize renewable energy production. You can visit or click for more on solar installation.
Activation
The installation of solar panels is the first step to becoming energy independent. During the activation of the solar system, the solar panels are connected to the electrical grid. This process ensures that the panels are installed properly and that they are producing energy.
Check if the electrical connection is checked to make sure it is secure and meets the necessary codes. After the solar panel system is activated and functional, electricity produced by panels is available to the household, offsetting or even eliminating costs associated with buying electricity from the utility grid.
The panels have electronics to help optimize their performance and safety, and this is all tested before turning the panels on. Once everything is checked, the system is usually connected to the grid and tested for performance, accuracy, and safety. This connection completes the installation of the solar panel array and it is ready for active operation.
Steps Taken During Solar Panel Installation
This article helped readers understand the process and duration of a solar panel installation. With the detailed steps included, readers gained a better understanding of the required labor and materials, as well as the importance of an electrician’s aid.
If you are considering a solar panel installation, the advice included will help plan and prepare your project. Contact a certified electrician to get started today.
If so, feel free to continue reading our blog. We are certain that you will find it both informative and engaging!